A. This project consists of the following: a. Replacement of existing booster station pumps, piping, valves, metering devices, and appurtenances. b. Replacement of existing motor control switchboard, SCADA, and gaugeboard cabinets and equipment. c. Furnishing a temporary MCC during construction to maintain station operations. d. Installation of a new HECo transformer, pad, primary and secondary ductlines, and associated equipment. e. Replacement of building lighting, interior and exterior. f. Replacement of ceiling tiles. g. Replacement of all building louvers and the grating above the areaway. h. Repair of concrete at the buildings areaway and windows. B. The scope of work identified in this section is the minimum required experience as it pertains to the contractor questionnaire in the Bid Solicitation. a. Installation of horizontal booster pumps and appurtenant work including motors, valves, piping, and gauge board on a potable water system. b. Installation of MCC and appurtenant work including power and control wiring and conduits on a potable water system.