The demolition work shall include, but not be limited to, the following items: 1. Prior to performing work, Contractor shall, at his sole expense, locate, mark, and memorialize all components of the improvements for restorative purposes, including, but not limited to, all pavement markings. 2. Remove asphalt concrete and concrete pavement within areas to receive new pavement or concrete. Dispose of removed materials to offsite location at Contractor’s expense. Provide weigh tickets to campus M&O Director for offsite material/soil disposal. 3. Locate and protect in place all underground and overhead utilities 4. Strip grass mat from trenching alignment prior to excavation and save to replace upon completion of trenching. 5. Loading, hauling, and dump fees for asphalt concrete, concrete, reinforcement steel, soil, and other removal items.