1. For supplying all labor, equipment, and material required for installation of new glycol digester heating system as shown on contract drawings and/or as specified. 2. The price bid shall include all work and materials required in these Contract Documents and not included in other bid items. a. Installation of heat exchangers and associated hot water supply and return piping. b. Installation of Sludge Pumps and associated piping. c. Installation of pumps and filters to support the secondary piping loop. d. Replacement of air handler heating coils. e. Installation, retrofit, or repair of existing concrete housekeeping pads or pedestals. f. Installation of feeders and control wiring for all new heat exchangers, pumps, and air handlers.