- Constructing a flow bypass dam and diverting each creek into an existing bypass pipe, - Removing approximately 1,000-1,300 cubic yards of accumulated sediment from the Maplewood Creek Sediment Basin in 2025 and approximately 900-1,000 cubic yards of accumulated sediment from the Maplewood Creek Sediment Basin in 2026, - Removing approximately 900-1,000 cubic yards of accumulated sediment from the Madsen Creek Sediment Basin in 2025 and approximately 900-1,000 cubic yards of accumulated sediment from the Maplewood Creek Sediment Basin in 2026, - Hauling and disposing of the sediment off-site, - Placement of gravel as directed in Maplewood Creek, - Removal of vegetation and sediment as directed from Maplewood Creek - Restoring flow to the sediment basins and removing the bypass dams, - Restoration, hydroseeding, and cleanup at each sediment basin, - Replacement of one plywood cover over a 42-inch dia. pipe.