A-1 1-04.4 SP MINOR CHANGES 1 EST $20,000.00 $20,000.00 A-2 1-07.15 SS SPCC PLAN 1 LS A-3 1-09.7 SP MOBILIZATION 1 LS A-4 1-10.5 SP PROJECT TEMPORARY TRAFFIC CONTROL 1 LS A-5 2-01.5 SP CLEARING AND GRUBBING 1 LS A-6 2-03.5 SP ROADWAY EX. INCL. HAUL 60 CY A-7 2-02.5 SP REMOVE CEMENT CONC. SIDEWALK 35 SY A-8 2-02.5 SP REMOVE CEMENT CONC. TRAFFIC CURB AND GUTTER 325 LF A-9 2-12.5 SP TRIAXIAL GEOGRID REINFORCEMENT 235 SY A-10 2-12.5 SP GEOTEXTILE FABRIC 250 SY A-11 2-12.5 SP ASPHALT INTERLAYER REINFORCEMENT 1,935 SY A-12 4-04.5 SP CRUSHED SURFACING BASE COURSE 70 TON A-13 4-04.5 SP CRUSHED SURFACING TOP COURSE 30 TON A-14 4-04.5 SP PERMEABLE BALLAST 180 TON A-15 5-04.5 SP HMA CL. ½” PG 58H-22 (LEVELING COARSE) 110 TON A-16 5-04.5 SP HMA CL. ½” PG 58H-22 (WEARING COARSE) 220 TON A-17 5-04.5 SP HMA CL. ½” PG 58H-22 60 TON A-18 5-04.5 SP PLANING BITUMINOUS PAVEMENT 2,005 SY A-19 7-05.5 SP ADJUST CATCH BASIN TO GRADE 8 EA A-20 7-12.5 SP ADJUST WATER VALVE TO GRADE 10 EA A-21 8-01.5 SP TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS A-22 8-02.5 SP PROPERTY RESTORATION 1 LS A-23 8-04.5 SP CEMENT CONC. TRAFFIC CURB AND GUTTER 80 LF A-24 8-04.5 SS CEMENT CONC. TRAFFIC CURB 245 LF