The Project generally consists of park, perimeter walking trail, footbridge, and dredge improvements to the Clark Reservoir Area, which includes four waterbodies, separated by Featherbed Lane, Raritan Road, and the Garden State Parkway referred to as the Headwaters, West Lake, Central Lake, and East Lake. The park improvements generally include the construction of parking lots, an access road, floating docks, and boat ramp. The perimeter walking trail and footbridge improvements generally include the construction of eight foot (8’) wide asphalt and aggregate walking trails, pedestrian footbridges, drainage improvements, and retaining walls. The dredging improvements generally include the dewatering, removal, and disposal of dredge spoils from the Headwaters, West Lake, and Central Lake.