A. Contractor shall have a qualified journey person elevator mechanic perform PM. Contractor shall schedule PM at least one (1) week in advance and provide a written schedule of PM to be performed, including a breakdown of the tasks, i.e. adjustments, cleaning, and lubrication of elevator. B. Contractor shall ensure all lubricants are of the proper composition, quality, and grade for the purpose used. C. Contractor shall check the following items for proper operation: machine motors, generators, brushes, fuses, controller, selectors, worm gears, thrusts, bearings, brake magnet, coils or brake motors, brake shores, windings, rotating elements, contacts, coils, resistances for control and motor circuits, magnet contact frames, leveling devices, guide rails and supports, traction sheaves, deflector sheaves, contacts for car doors or gates, car door operation devices, push buttons, annunciators, indicators, hall lanterns, bulb replacements, hydraulic cylinder, plunger, pumps, valves and other elevator signal scheduling and accessory equipment complete, where included as part of the elevator installations.