a. the supply of eight (8) electric vehicle supply equipment (EVSE), also known as “EV Chargers” or “EV Charging Stations” in accordance with the technical specifications and performance requirements herein. b. Complete commissioning of the units, including setup and calibration of the equipment by a qualified technician, including integration of the DTA’s 3rd Party charger monitoring software (or approved equal) provided to the DTA by the Supplier (The DTA currently uses Viriciti software). c. Integrate new chargers with existing communications networks/charge management software (or new, nonproprietary software) provided by the Supplier at no additional cost to the DTA. d. Coordinate with installers to complete commissioning of the chargers, and install any applications required to meet the sequence of operation and the design/performance intent of the system. e. Provide any required training for maintenance personnel/end users. f. All products, including any software installed as part of this Project shall be the latest versions offered by the manufacturer, and the manufacturer must demonstrate to the extent possible that these products will be supported with both parts and service for a minimum of eight (8) years. g. The DTA retains the rights to all data, including documentation, and all rights to execute work to repair, replace, upgrade, and expand the system without subsequent or future dependence on the Contractor. Products requiring the use of a proprietary or other specific licensed, off-site, non-embedded software product or programming tool are not acceptable as this reduces the DTA’s options for contractors for future service.