Project Foys Lake Rd (S-503) will perform the following work: • Mastic crack filling of cracks larger than 1.5” and the transverse “thumper” cracks from reference post 2.6 to 10.5. • 0.20’ asphalt mill and overlay full width from reference post 1.4 to 2.6. • Scrub seal and cover and fog seal the pavement full width from reference post 1.4 to 10.5. • Other work will include pavement markings, centerline sinusoidal rumble strips, guardrail, guardrail end section widening, revegetation, and signing and delineation upgrades. The project begins at RP 1.4 (near the Foys Lake Road Interchange for the Kalispell Bypass), and extends for 9.1 miles along S-503 (Foy’s Lake Road) to RP 10.5 (ending at the Airport Road Roundabout at the Kalispell Bypass).