This project is for the replacement of Bridge CL-383 which carries Upper Beckleysville Road over Murphy Run. The project begins at a point roughly 200 ft northeast of the intersection of Gross Mill Road and Upper Beckleysville Road and extends in a northeasterly direction for a project distance of 0.07 miles. The work includes: detour and maintenance of traffic during temporary roadway closure throughout project duration; demolition and removal of the existing superstructure and portions of the existing substructure, including installation of demo shielding for the removal of the existing bridge section; construction of new concrete pile cap abutments and wing walls supported on micropile deep foundations; construction of a new single span bridge comprised of seven (7) adjacent prestressed slab panels, 32’-0” long center to center of bearings with a 5” concrete overlay deck and three (3) strand structural tube railing (the new superstructure will provide a 24’-8” clear roadway width and a 29’-0” out-to-out superstructure width); associated roadway work including pavement milling, asphalt paving, and installation of traffic barrier w-beam with corresponding end treatments; and all other incidentals necessary to complete the work.