1. Lump Sum L.S. Mobilization (not to exceed $20,000) @______________________Per L.S. _________ ________ 2. Lump Sum L.S. Traffic and Dust Control@________ ______________________Per L.S. _________ ________ 3. Lump Sum L.S. Clearing and Grubbing@________ ______________________Per L.S. _________ _________ 4. Lump Sum L.S. Administer Erosion Control Plan @ ______________________Per L.S. ___________ _________ 5. 82,618 S.F. Grind and Remove Pavement @____ ______________________Per S.F. __________ _________ 6. 82,618 S.F. Fine Grade Aggregate Base@______ ______________________Per S.F. ___________ _________ _ 7. 1704 TON Hot Mix Asphalt, Type A @_______ ______________________Per TON _________ _________ _ 8. 1 EA. Adjust Existing Storm Drain Manhole@_____________________ _______________________Per EA. _________ _________ 9. 8 EA. Adjust Existing Sanitary Sewer Manhole@_____________________ _______________________Per EA. 10. 12 EA. Adjust Existing Water Valve Box/Lid @______________________Per EA.