i. Existing conditions survey and as-built record drawing to include property corners, property lines, and existing infrastructure located on the properties. ii. Review the existing conditions survey and confirm details needed to design the system improvements. iii. Schedule and attend a kick-off meeting with County staff to finalize the scope of the project and discuss project details and schedule. iv. Coordinate with County staff on all equipment and appurtenances needed to connect to County SCADA system. v. Identify and address any wetland and floodplain issues. The selected consultant shall survey the proposed location provided, or any other proposed building site, and verify elevations prior to design to ensure all controls are a minimum of two (2) feet above the floodplain (Based on NAVD 1988) and that no additional mitigation is required.