Said Construction generally consists of Street Reconstruction, Sanitary Sewer, Storm Sewer, Watermain, and Street Lighting. The work includes the following approximate quantities of work: 2106.507 EXCAVATION - ________ 6167 CU YD 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) 2725 CU YD 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) 1973 CU YD 2301.504 CONCRETE PAVEMENT 8" 7565 SQ YD 2360.509 TYPE SP 12.5 WEAR/NONWEARING COURSE MIX (_,_) 303 TON 2531.503 CONCRETE CURB & GUTTER DESIGN ____ 5121 LIN FT 2575.504 SODDING TYPE SALT TOLERANT 2984 SQ YD 2571.502 PERENNIAL NO 1 CONT 549 EACH 2571.502 ________ TREE __" CAL/HT B&B 28 EACH 2503.503 __" RC PIPE SEWER DES 3006 CL __ 1551 LIN FT 2506.602 CONSTRUCT DRAINAGE STRUCTURE DESIGN ________ 27 EACH 2106.601 DEWATERING 1 LUMP SUM 2503.603 60" PIPE SEWER 425 LIN FT 2503.603 8" PIPE SEWER 500 LIN FT 2504.602 12" GATE VALVE AND BOX 4 EACH 2504.603 12" WATERMAIN DUCTILE IRON CL 52 831 LIN FT 2504.608 WATERMAIN FITTINGS 728 POUND 2545.501 LIGHTING SYSTEM 1 LUMP SUM 2582.503 __" SOLID LINE MULTI-COMPONENT GROUND IN (WR) 3604 LIN FT 2521.518 __" CONCRETE WALK 10756 SQ FT 2521.518 3" BITUMINOUS WALK 4635 SQ FT