1. Full Depth Saw Cut LF 3,829 2. 2’ PCC Curb and Gutter, Remove and Replace LF 1,794 3. 4” PCC Sidewalk, Remove and Replace SY 740 4. 4” PCC Sidewalk, Remove Existing SY 31 5. 6” PCC Sidewalk, Remove and Replace SY 107 6. PCC Sidewalk, Pedestrian Ramp SY 692 7. Detectable Warning Panel SF 760 8. Existing Driveway Approach, Remove SY 43 9. 6” PCC Alley Approach, Remove and Replace SY 424 10. Remove 6” PCC Pavement and Replace with 7” PCC Pavement (M-Mix) SY 1,133 11. Solid Rock Excavation CY 96 12. Sanitary Sewer Manhole, Remove and Replace Base, Barrel Sections, and Cone Section EACH 9 13. Sanitary Sewer Manhole, Drop, Remove and Replace Base, Barrel Sections, and Cone EACH 2 14. Sanitary Sewer Manhole, Adjust Top, Use Existing Rings, Casting and Cover EACH 11 15. Internal Chimney Seal EACH 11 16. External Chimney Seal EACH 12 17. Sanitary Sewer Service Wye, 8”x4” EACH 1 18. Sanitary Sewer Service Wye, 8”x6” EACH 2 19. Sanitary Sewer Service, 4” LF 10 20. Sanitary Sewer Service, 6” LF 20 21. Storm Sewer Manhole, Adjust Top, New Rings, Casting, and Cover EACH 1 22. Storm Sewer Intake, Remove and Construct Type SW-501 EACH 2 23. Storm Sewer Intake, Remove and Construct Type SW-507 EACH 2 24. Storm Sewer Main, Install 15” PVC LF 13 25. Water Valve, Adjust Road Box EACH 32 26. Water Valve Manhole, Adjust Top, New Rings, Casting, and Cover EACH 1 27. Water Valve Manhole, Adjust Top, Use Existing Rings, Casting and Cover EACH 1 28. Water Valve, 8”, Remove and Replace EACH 2 29. Water Main, 4” DIP LF 20 30. Water Main, 6” DIP LF 151 31. Water Main, 8” DIP LF 49 32. Water Main Fittings LB 2,565 33. Tap Water Main and Install 1” Corporation EACH 3 34. Water Service, 1” Copper LF 30 35. Granular Backfill Material TON 2,099 36. Crushed Aggregate Base Course TON 430 37. Pavement Scarification SY 13,367 38. Asphalt Binder, PG 58-28S, Standard Traffic TON 241 39. Hot Mix Asphalt Standard Traffic, Base Course, 1/2 In. Mix TON 1,830 40. Hot Mix Asphalt Standard Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement TON 2,194 41. Seeding and Fertilizing, Urban LS 1 42. Topsoil TON 229 43. Traffic Control LS 1 44. Mobilization LS 1