1 Mobilization LS 1 2 Traffic Control & Construction Area Signs LS 1 3 Grind 1-inch of AC Pavement SY 32,425 4 Excavation, Removal, and Disposal of Existing AC Pavement and Underlying Material (Digouts) CY 1,128 5 Sawcut AC Pavement LF 143 6 Crack Sealing SY 32,425 7 1-inch AC Leveling Course TON 1,825 8 2-inch AC Pavement TON 3,650 9 Header Cut Grinding SY 2,890 10 0.12 Header Cut Grinding SY 31 11 4.5-inch AC pavement at Digouts Tons 457 12 18-inch Class II Base at Digouts Tons 1,685 13 Pot Hole Repairs prior to AC Leveling Course Tons 25 14 Adjust Stormwater Grate to Finish Grade LS 1 15 Road Striping and Signage LS 1 16 Surveying and Construction Staking LS 1 17 Monument Preservation LS 1 18 Erosion Control LS 1 19 Geosynthetic Pavement Interlayer Fabric SF 334,061