The project consists of pavement replacement of approximately 2.043 miles of CTH M from Lange Road to CTH RR. The work, in general, will include the following major items of work: 300 SY - REMOVING ASPHALTIC SURFACE 590 SY REMOVING ASPHALTIC SURFACE BUTT JOINTS 1,060 CY - EXCAVATION COMMON 1,040 CY - BORROW 1 EA - PREPARE FOUNDATION FOR ASPHALTIC PAVING (PROJECT) 2,600 TON - BASE AGGREGATE DENSE 3/4-INCH 375 TON - BASE AGGREGATE DENSE 1-1/4-INCH 30,000 SY - PULVERIZE AND RELAY 2,110 GAL - TACK COAT 3,660 TON - HMA PAVEMENT 3 MT 58-28 S 2,850 TON - HMA PAVEMENT 4 MT 58-34 S 100 TON - ASPHALTIC SURFACE 32 TON- ASPHALTIC SURFACE DRIVEWAYS AND FIELD ENTRANCES 48 LF - CULVERT PIPE REINFORCED CONCRETE CLASS IV 72-INCH 122 LF - CULVERT PIPE CORRUGATED POLYETHYLENE 15-INCH 6,205 SY - SALVAGED TOPSOIL 6,970 SY - EROSION MAT URBAN CLASS I TYPE B 1 EA - TRAFFIC CONTROL 42,640 LF - MARKING LINE EPOXY 4-INCH 495 LF - DITCH CLEANING This project is a Local Road Improvement Program (LRIP) funded project. LRIP project number #19160