EXISTING PAVEMENTS Existing on-site roadways may be used for construction traffic. The Contractor shall provide temporary additional roads needed for required construction access, maintain existing roads throughout construction, and restore to original or better condition at completion of work. BASE AND TOPPING MATERIALS For temporary construction which will be removed when no longer needed for construction purposes, and all affected areas restored to original or better condition at the completion of work, the selection of these materials is at the Contractor's option, unless otherwise specified. OWNER OCCUPANCY Owners will occupy premises during entire construction period. The Contractor shall cooperate with owners in scheduling operations to minimize conflict and to facilitate owner's usage.