1. Construction of a new wastewater treatment plant at the City's existing Wastewater Treatment Plant #2 site including a new influent lift station, headworks structure, two (2) aeration basins, two (2) final clarifiers, sludge pump station, three (3) sludge drying beds, UV disinfection structure, flow measurement structure, standby generator, and operations building containing associated equipment, materials, utilities, and appurtenances as show in the Plans. 2. Construction of a new transfer lift station at the City's existing Wastewater Treatement Plant #1 site including a standby generator and 6-inch PVC force main. 3. Facilitation and coordination of new electrical utility services to the new wastewater treatment plant and transfer lift station facilities. 4. Decommissioning, abandonment, and/or removal of existing facilities, infrastructure, equipment, and materials as shown in the Plans.