CONTRACTOR shall furnish all materials, appliances, tools, equipment, transportation, services and all labor and superintendence necessary for construction of the work described herein. The completed work shall not lack any part which can be reasonably implied as necessary for proper and useful operation of the facility. The work, in general, consists of the following: 1. Installation of pollution prevention measures 2. Installation of new water mains 3. Pavement restoration 4. Site cleanup and restoration. SAWS 100 MOBILIZATION LS 1 SAWS 101 PREPARATION OF RIGHT-OF-WAY LS 1 SAWS 102 INTERMEDIATE DEMOBILIZATION AND REMOBILIZATION EA 1 SAWS 550 TRENCH EXCAVATION SAFETY PROTECTION LF 9375 SAWS 817 3" C900 PVC WATERLINE (ENCASEMENT) LF 1076 SAWS 818 6" C900 PVC DR18(CL 150), WTR LN LF 35 SAWS 818 8" C900 PVC WATERLINE LF 145 SAWS 818 12" C900 PVC DR18(CL 150), WTR LN LF 3157 SAWS 819 18" C900 PVC DR18(CL 150), WTR LN LF 4199 SAWS 824 RELAY 3/4" SHORT SERVICE EA 7 SAWS 824 RELAY 1" SHORT SERVICE EA 4 SAWS 824 RELAY 1" LONG SERVICE EA 15 SAWS 828 GATE VALVE & BOX (COMPLETE)(8 IN) EA 6 SAWS 828 GATE VALVE & BOX (COMPLETE)(12 IN) EA 18 SAWS 830 BUTTERFLY VALVE & BOX (COMPLETE)(18 IN) EA 12 SAWS 831 12" X 12" TEE CUT IN EA 1 SAWS 832 TAPPING SLEEVES AND VALVES EA 3