This Project consists of Design of an approximately 1-mile section of the Lynn Lane Trunk Sewer Line located from 500 feet North of E Jasper Street to just North of E Tucson Street. The existing Trunk Sewer Line is composed of 18” Clay Pipe and brick Manholes. This line has had several issues and has started deteriorating due to age and material, causing leaks and problems with Inflow and Infiltration. To remedy these issues, BAMA has proposed to rehabilitate and potentially upsize this Trunk Sewer Line and associated Manholes. The selected Consultant will need to determine an appropriate size and material for the Trunk sewer to ensure it will be able to handle current load capacities and future developments, and produce design plans for construction to address these issues.