Bastrop County has purchased a pre-engineered metal building that will replace the Road and Bridge Precinct 2 shop/office at 911 SE Martin Luther King Blvd, Smithville, TX 78957. The following tasks are required for this turnkey project: Foundation and Concrete Flatwork: CONTRACTOR shall excavate for grade beams, piers and other fine grading associated with the foundation and concrete flatwork. CONTRACTOR shall provide and install building foundation and site concrete flatwork per the civil and structural foundation design drawings. CONTRACTOR shall provide rebar shop drawings and placing drawings for review and approval by Bastrop County in accordance with ACI 315 specifications. Contractor to provide and install Bollards as shown in attached drawings. BASTROP COUNTY is responsible for parking areas, site drainage and drainage facilities, (storm sewer, culverts, etc..) site grading and paving. BASTROP COUNTY is responsible for providing and installing compacted base material and grade building site to bottom of building slab elevation. BASTROP COUNTY will haul-off and remove any excess excavated material associated with the excavation of the piers, grade beams and fine grading of the site...