For consideration, firms need to have experience providing traffic engineering, hydraulics, hydrology, drainage area analysis, box culvert design, and/or box culvert extension experience, retaining wall design, curb and gutter, traffic control, and storm drainage design. Firms must demonstrate engineering resources are immediately available to engage in scoping the project, developing concepts and construction estimates, and have the resources to accelerate project final design. A new Fire Station is currently under construction on the southeast quadrant of Markley Road and Crawford Street intersection. It is desired to complete the road widening on Crawford in the vicinity of the new fire station as soon as possible.