The Work of this project provides for the furnishing of all labor, materials, appliances, tools, equipment, and plant, and the performing of all Work in accordance with these specifications and drawings, with exception of work that is expressly and specifically not included in the project. The project consists of one (1) contract: NFIA Airside Pavement Management 2025/2026. The project will be implemented under two (2) separate Notices to Proceed (NTP-1 and NTP-2) in two (2) contract years as set forth in the Contract Documents. The Work provides for full and partial depth repairs of Portland Cement Concrete (PCC) pavement on Taxiway D1 and Taxiway C, including the removal and replacement of deteriorated pavement sections and restoration of joints and markings. Landside Work includes full-depth pavement repairs, concrete curb restoration, and the rehabilitation of existing utility structures and drainage inlets within the parking facilities and roadway system, including installation of self-leveling frames and pavement markings.