Complete installation of the new specified security glass in the locations noted to include the following items: 1. New security glass of the type and sizes noted on the individual school drawings (Elevations and Floor Plans). Note: The floor plans for the schools noted will only be released to the successful bidder, the bids will be based on the elevation drawings and quantities for each size of glass. 2. New metal door glass light kits, to replace any existing wood glass stops where noted on the elevation drawings. 3. Structural silicone as specified on each side of the glass stops (all locations). 4. Demolition (removal) of the existing glass (to be removed from the school site), and other misc. debris removal. 5. Clean up of the area in which the work has been performed