The project generally consists of upgrading the existing Jerry Ust Recreational Complex located on Bordentown Avenue. The work involved with these improvements includes the furnishing and installation of two (2) drainage system network and aggregate base construction improvements including reinforced concrete edge curbing and all appurtenances, that are necessary for the placement of two (2) new Synthetic Turf systems to be installed by Others under a separate Contract. Athletic Field Sports Lighting will also be installed at the upgraded athletic fields by Others under a separate Contract and during the construction of this project. The work involved with these improvements includes paved access road extension and new parking lot area; maintenance and protection of vehicular / pedestrian traffic; all safety procedures / provisions, coordination / scheduling of all work; site clearing and site grading operations; cutting and removal of existing trees; construction of variable height modular block type retaining walls including design calculations and certifications; completely operational access road / parking lot lighting systems with all electrical appurtenances; coordination with JCP&L including necessary trench excavation / backfill, installation of PVC conduit, pullbox structure, reinforced concrete transformer pad and all other associated JCP&L work; coordination with Williams Gas Company including test pit excavations and compliance with all requirements / procedures; installation of approximately 2,650 lineal feet ± of 12” diameter perforated HDPE collector pipe / underdrain; installation of approximately 1,435 lineal feet ± of various sizes of RCP Class IV and V of storm sewer pipe reaches; construction of various types of storm sewer structures; rip-rap lined conduit outlet protection area; construction of approximately 2,400 cubic yards ± of underground detention basin facility including 36” diameter perforated HDPE pipe reaches, various types of drainage structures, clean crushed stone encasement, geotextile filter fabric and all appurtenances; installation of approximately 600 lineal feet ± of 8” DIP water main; resetting of existing water main / hydrant valve boxes; removal and replacement of existing deteriorated sanitary sewer manhole frames / covers; construction of approximately 1,200 square feet ± of 6” thick reinforced concrete slabs; construction of approximately 8,000 square yards ± of HMA meandering walkways, milling existing pavement; installation of approximately 2,000 cubic yards ± of dense graded aggregate base course material; installation of approximately 3,000 tons ± of HMA base course material and approximately 1,500 tons ± of HMA surface course material; parking area improvements including signage, bumper blocks and application of approximately 6,500 lineal feet ± of pavement stripes / markings (4” wide lines); furnishing and installation of approximately 2,100 lineal feet ± of timber guide rail and all appurtenances; timber post / rail type fence; installation of approximately 2,800 lineal feet ± of various height vinyl coated chain link fence and various height / width of vinyl coated chain link fence gates; one (1) galvanized steel chain link backstop, furnishing and installation of two (2) non-elevated bleachers; aluminum / galvanized steel benches, site landscaping including 24” thick topsoil and 4” thick hardwood mulch; furnishing and installation of approximately 33,500 square yards ± of 5” thick topsoil, seed and mulch and/or soil stabilization matting, where applicable; final clean-up; and all other associated site improvements, preparation, restoration and necessary work in accordance with the Contract Documents.