The work to be done under this contract consists of the following. This Project consists of two different paving locations within ¼ mile from each other. Cascade Locks Maintenance - 60 NE Forest Ln Cascade Locks OR 97014. Cascade Locks Stockpile Yard - 30 Wa Na Pa St Cascade Locks OR 97014. Pave 2” depth inlay, level 3 – ½ inch ACP at Maintenance yard. Approximately 68,150 sqft Pave 6” and 4” depth, level 3 - ½ inch ACP at Stockpile site over existing gravel. Approximately 950 sqft @ 6” and 2,800 sqft @ 4” ODOT will provide prep work including preparation of aggregate base, 2” asphalt grinding at Maintenance yard and sweeping. Work hours are weekdays from sunrise to sunset excluding holidays unless approved by the project Manager.