ADVERTISEMENT FOR PREQUALIFICATION FOR DESIGN-BUILD SUBCONTRACTORS (“SUBCONTRACTORS”) PLUMBING The PENTA Building Group on Behalf of California State University, Long Beach (“CSULB”) An Equal Opportunity Employer is requesting, subject to conditions prescribed by CSULB, prequalification documents from potential subcontractors for the following project: California State University, Long Beach University Student Union Renovation and Expansion Phase 1 24-25 Project No. 00624SS002 City/Location: Long Beach, CA Owner: California State University, Long Beach Project Architect: Gensler CSULB and The PENTA Building Group have established that all Design-Build Subcontractors that are interested in submitting bids on this project must be prequalified. Instructions on how to begin the prequalification process are provided further on in this Advertisement. Only prequalified subcontractors will receive bid packages via the Request for Proposals. RFQ Due: 4/23/25 @ 5PM Send all RFQ Responses to Zack Hagan at zhagan@pentabldggroup.com Project Description: The overall objective of the project is to design and renovate the existing University Student Union (“USU”) building, approximately 180,000 GSF. This includes approximately 160,000 GSF of interior area and 20,000 GSF of outdoor covered walkways and seating areas. The project scope also includes the demolition of the existing University Dining Plaza (UDP) building, and the design and new construction of an approximately 61,000 GSF building addition. Target budget for this scope of work is $7,000,000. The project has high sustainability goals including the requirement for both structures, as a minimum, to receive LEED Gold Certification. The energy use index range for this project shall be between 30-40 kbtu per square foot. Title 24 shall be surpassed by at least 10% in the Energy Compliance Performance Model. The new construction is expected to be a Type 1A structure. Project milestone, Onsite Construction, completion is scheduled for May 28, 2028.