Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Pavement Preservation and Maintenance Services at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. General Notes: Deep Patching (Recycled Asphalt Concrete Patching, Including Bituminous Material and H-Lime), will be placed at the location listed above. The Deep Patching will be constructed at a depth of four (4) inches by milling the existing material, cleaning, applying Tack Coat, and replacing with 19mm asphalt. Temporary markings shall be placed at the end of each day and shall be included in the Traffic Control bid price. In addition, permanent striping shall not be placed until 15 calendar days after completion of recycled asphalt concrete patching operations.