The Consultant shall perform all tasks necessary to fulfill the following: A. Scoping/Concept Development. B. Database Preparation. C. Environmental Document. D. Preliminary Design. E. Right-of-Way Plans. F. Final Design. G. Construction Revisions and Shop Drawings. H. Public Involvement. I. Quality Assurance/Quality Control Reviews for all deliverables. J. Attendance in and meeting minutes of monthly meetings to discuss progress and/or issues (additional meetings may be required to resolve major project issues). K. Prepare, reproduce, and distribute preliminary and final plans and all supporting disciplines (signing and marking, erosion control, R/W, Utilities, etc.) as well as all special provisions, all design files, and supporting documentation. L. All required engineering studies are considered part of the scope of services. All deliverables shall be in accordance with but not limited to the TIA Manual, Electronic Data Guidelines (EDG), GDOT Design Policy Manual, GDOT Drainage Manual, Plan Presentation Guide, GEPA and the GDOT Environmental Procedures Manual.