Bore approximately 1400, linear feet of 2” CTS with tracer wire. 2” CTS Main inline shut off. Installed within 15’ of main supply from water company. 2” CTS bored to all existing valves with trace wire. Designated on map. 2” CTS bored to new valve location at current RR facility. Install one (1) brass (lead free) compression isolation valves with 20” curb box into current line supplying building at designated location forward by ODNR. 2” CTS bored to new valve location to the northwest corner, between the camp store and the stop sign. Install one (1) brass (lead free) compression isolation valves with 20” curb box into current line supplying building at designated location forward by ODNR. Install four (4) tee connections lead free brass fittings, as designated by ODNR. Line will be installed at a depth below the frostline. The bore pit areas, valve & tee install area, and sanitary hydrant install area require leveling and seeding once complete. OUPS is required to be notified by contractor. Any shipping costs must be included in the cost of the item.