Vendor will be responsible for providing all supplies, equipment and labor to completely remove asbestos, per the project objectives as listed below. A. Remove all asbestos containing material from the former Gem and Mineral Society Structure (see identified areas on drawings, pages 11-14) 1. Abatement of multi-layer wall surfacing on plaster mesh (exterior) 1750 sq. ft. 2. Abatement of wall & ceiling surfacing/texture with join compound on sheetrock (interior) 4,200 sq. ft. 3. Abatement of 9”x9” floor tile with mastic (NE Room) 300 sq. ft. 4. Abatement of 12”x12” vinyl flooring squares (restrooms) 24 sq. ft. 5. Abatement of tan vinyl sheeting on prep tables & kitchen counter (NE room & kitchen) 100 sq. ft. B. Contractor shall ensure that no individual is exposed to asbestos fibers in excess of levels set by law. C. Contractor shall ensure that no asbestos contamination occurs outside any containment erected by Contractor. D. Contractor shall ensure that all asbestos waste is disposed of in accordance to all applicable laws. E. Contractor shall document all activities pertaining to this project in accordance with all applicable laws.