Work shall include survey, well design, permitting, bidding support, and construction oversight, and engineering design of surface facilities, permitting, bidding support, construction oversight, engineering inspection, record drawings preparation, Injection Well Completion Report preparation, Injection Well Operation and Regulatory Compliance Manual preparation and operational testing oversight of two Class I Underground Injection Control (UIC) Deep Injection Wells (DIW) for wastewater effluent disposal. Included project tasks are summarized as follows: 2.1.1. Survey of two sites for proper location of proposed injection wells. 2.1.2. Class I Injection Well systems hydrogeologic and engineering design. 2.1.3. Class I UIC Florida Department of Environmental Protection (FDEP) Construction Permit application preparation 2.1.4. Site Engineering Design and Pinellas County Development Order application preparation. 2.1.5. Well construction bidding services, preparation of bid documents. 2.1.6. Class I Injection Well drilling and testing oversight with Well Completion report preparation. 2.1.7. Construction and Engineering Inspection (CEI) at the two well drilling sites. 2.1.8. Design and permitting of the surface facilities...