Eiland Boulevard/CR54 Reclaimed Water Main: The Work of this Project includes installing approximately 9,550 linear feet (LF) of 12-inch polyvinyl chloride (PVC) reclaimed water (RCW) force main along Eiland Boulevard from Simons Road to Dairy Road. Horizontal directional drilling (HDD) of approximately 3,300 LF of 12-inch high-density polyethylene (HDPE) will be used to cross Simons Road, Silver Oaks Drive, Eiland Boulevard, Fair Lawns Drive, Fort King Road, US 301 (Gall Boulevard), and various driveways and sidewalks as shown in the Contract Documents. The remaining 6,200 LF of 12-inch pipe will be installed using opencut installation methods. This will include the installation of 600 LF of 6-inch HDPE lateral mains via HDD at Sta. 37+25 and Sta. 46+66 Eiland Boulevard. The 6-inch lateral mains will include open-cut pipe and fittings as noted on the Drawings. Project restoration will include repairing pavement, resodding of affected areas, and replacing the concrete curb/gutter and sidewalk.