1 Contractor shall provide a lump sum bid for mobilization and demobilization. 1 L.S 2 Contractor shall provide a lump sum bid for all labor, materials, and equipment required to pull the pump, motor, line shaft, bearings, and pump column. Pump set at 190 feet. 1 L.S 3 Contractor shall provide a unit cost for a downhole well video inspecting the well before and after well cleaning. The contractor shall submit a detailed writen video logging report along with an online link. 1 L.S 4 Contractor shall provide a lump sum bid for the inspection and creation of a report detailing the condition of all components. Contractor shall provide their recommendations to repair or replace any components. 1 L.S 5 Contractor shall provide a lump sum bid to air shock well. 1 L.S