A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, Remediation, Excavation, Civil, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Building a new storage garage that will be shared between the existing CABHH and MSHS facilities, as well as the potential transitional facility in the future. It will house equipment such as a truck, plow, a trailer, lawn mowers, and a skid steer with attachments. The building will have 2 overhead garage doors, windows, and a personnel door. The building will also include electricity, a floor trench drain, water line connection. The aesthetic of the building will match the existing CABHH facility.