Specifications include, but are not limited to: 3.4. Project 1: CTH JG (CTH A to Britt Valley Road) - Project Overview A. The proposed CTH JG project is an overlay project with paved shoulder widening. B. This project is 3.56 miles long extending from CTH A to Britt Valley Road. C. The existing roadway consists of 11-foot lanes, 0-foot paved shoulders, and 4-foot aggregate shoulders. D. The proposed roadway cross section will consist of 11-foot lanes, 3-foot paved shoulders, and 1- foot aggregate shoulders. E. This project is 100% locally funded 3.5. Project 1: CTH JG (CTH A to Britt Valley Road) - Scope of Work A. The scope of this project includes both preliminary and final design of CTH JG. B. The typical section will consist of 11-foot lanes, 3-foot paved shoulders and 4-foot aggregate shoulders.