The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a slope improvement project at three locations along Outer Loop Road in Prescott. The total project length is 2,225 feet with approximately 11,610 cubic yards of roadway excavation and haul away. Other associated work includes removal of 1,813 linear feet of existing fence and installation of 1,980 linear feet of new fence, installation of 1,270 linear feet of brow ditch, and installation of 20 linear feet of 15 inch Arch Corrugated Metal Pipe. The contractor shall be responsible for proposing and implementing a proper traffic control plan including the utilization of temporary concrete barriers and temporary impact attenuators. All work is to be done in accordance with the plans, specifications, and contract documents.