The scope of work includes the acquisition, installation, connection, testing, and start-up of the new generators, transfer switches, and related appurtenances to ensure functionality of equipment and facilities to be powered by the generators. Please review drawings for details. Full compliance with FEMA and GEMA practices will be needed for this project. List of equipment to be provided & installed (see Exhibit 1 for more details): • Public Works Building, Pt. Peters R – 250kw fixed generator and automatic transfer switch • Trailer-mounted 48kw generator for two manual transfer switches - Lift Station #11-A (West Alexander St) and Lift Station #23 (1200 Shawdowlawn Drive) • Trailer-mounted 100kw generator for two manual transfer switches - Lift Station #11-B (West Alexander St) and Lift Station #1-B (East Weed St) • Trailer-mounted 48kw generator for two manual transfer switches - Lift Station #42 (Dark Entry Creek) and Lift Station #35 (1900 Shadowlawn Drive) • Trailer-mounted 100kw generator for two manual transfer switches - Lift Station #4 (Borrell Blvd) and Lift Station #15 (Colerain Rd at Sugar Mill) • Trailer-mounted 48kw generator for two manual transfer switches - Lift Station #53 (St. Mary’s Rd.) and Lift Station #48 (Haddock Rd) • Trailer-mounted 100kw generator for two manual transfer switches - Lift Station #6 (Osborne Street) and Lift Station #13 (Douglas Dr.) • Trailer-mounted 48kw generator for two manual transfer switches - Lift Station # 9 (Pt. Peter @ Ball Field) and Lift Station #31(New Point Peter Rd) • Trailer-mounted 100kw generator for two manual transfer switches - Lift Station #18(Colerain @ Kings Bay Rd.) and Lift Station #65 (Winding Rd. @ Bridgewater Dr.) • Install electrical equipment to existing electrical & provide all new wiring per equipment manufacturer requirements and/or existing site conditions.