SCOPE OF WORK: Sandown Central Gymnasium/Cafeteria Roof Replacement Carlisle Fully Adhered EPDM Rubber Roof System • Provide all labor, materials, tools, equipment, and supervision necessary for the installation of a SureSeal 60-mil EPDM membrane Fully Adhered Roofing System, including flashings and insulation as specified herein and as indicated on the drawings per the manufacturer’s most current specifications and details. • The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work. • Before bidding, the roofing contractor shall confirm all given information and advise the building owner of any conflicts affecting their cost proposal. • Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer must submit for pre-qualification in writing fourteen (14) days before the bid date. Any contractor who fails to submit all the information as requested will be subject to rejection. Bids stating “as per plans and specs” will be unacceptable.