This project is for milling, Full Depth Reclamation, patching and resurfacing of various City streets. 1 Mobilization/Demobilization Lump 1 2 General Conditions Lump 1 3 Asphalt Milling (Depth 0"-4" ) Yd2 119,620.52 4 Asphalt Patching (Binder-19mm) Tons 2,557.18 5 Portland Type 1 Cement (FDR mixing of roadways) Tons 1,200.21 6 FDR - Recycle in place- 10 Inch Depth Yd2 40,007.00 7 9.5mm-(Super Pave Type II, GP 2, & H Lime) Tons 13,625.20 8 Replace Water Valves Riser Each 9 Replace Sewer Manhole Cone Each 1 10 Raise Sewer Manhole Each 14 11 5-Inch Yellow Striping (Thermoplastic) Lf 14,125.00 12 5-Inch White Striping (Thermoplastic) Lf 13 12-Inch Stop Bars (Thermoplastic) Each 6 14 Reflective Pavement Markers (RPMs) Each 482 15 Golf Cart Crossing (Thermoplastic) Each 9 16 Remove & Replace Curb and Gutter Lf 4965.00