EXIT 282 portion of this project is for ride improvement; there are several high and low spots to even out, so it will be necessary to survey the grade and mill existing asphalt to produce a smooth and even surface to place new asphalt, in order to provide a safe travel lane for the public. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 382 tons of ¾” Commercial Plant Mix Grade S PG 58H-34/64 -28 asphalt mix material. The overlay shall be paved .15 feet thick and approximately 27 feet wide and 1,320 feet long. Contractor will be allowed to close EXIT 282 while work is in progress. Detour must be set. EXIT must be opened as soon as the work is complete for the day. Central Avenue West portion of this project is a mill and fill. Contractor will provide all labor, equipment, materials, incidentals and traffic control necessary to produce, haul, place, tack and compact approximately 468 tons of ¾” Commercial Plant Mix Grade S PG 58H-34/64-28 asphalt mix material. The overlay shall be paved .15 feet thick and of varying widths approximately 800 feet long. This segment of road starts 2-lane and goes to 1-lane. There is also a turn lane and the approach at 21st NW that are included. There are 2 manholes, and a water shut off within the project, around 20th St SW. The Department will provide final striping. Contractor shall be responsible for all private property damage claims resulting from performance of the tasks described above.