Contractor to apply termite treatment prior to pouring concrete. Contractor to install (pour & finish) 4” reinforced concrete slab foundation per specifications in contract drawings. Contractor to apply ten (10) Mil vapor barrier on compacted subgrade. Contractor to install electrical wiring, switches, and outlets per contract drawings. Concrete floor in open shelter area shall serve as finished floor. Kitchen and two restroom floors shall be 12’ by 12” ceramic tile. Where applicable, contractor to install all drywall and perform finish work which consist of two coats of interior paint on drywall, concrete block and painted semi-gloss base board and casings. Contractor to perform all plumbing, electrical, HVAC per specifications identified in contract drawings. Contractor to install one fire extinguisher cabinet in the kitchen area and one fire extinguisher cabinet in the open shelter area. Contractor to install intake vents and exhaust fans. Contractor to install water heater. Contractor to install storage/utility unit (with metal solid-core door and hardware). Contractor to install “Hardee Plank” siding for gable ends. Contractor to demolish existing structure, haul off debris and supply dumpsters for new construction project. Contractor to provide all insurance requirements prior to contract award by owner.