The contractor shall furnish all necessary labor, supervision, equipment, tools, materials, supplies, and any other items or activities related to providing the following services: 1. This Phase 2 will focus on Parcels 27-15-03-06-1-000-001.008; 27-15-03-06-1-000-001.004; 27-15-03-06-1-000-001.009. These parcel will be divided into two decision units. Each decision unit should include surficial soil, subsurface soils and groundwater sampling. 2. A Phase 2 ESA that follows the Alabama Environmental Investigation Guidance along with the Brownfield Redevelopment Division 15 Regulations and ASTM Standards. The Phase 2 must address all Recognized Environmental Concerns (RECs) identified in the Phase 1 ESA. • A Phase 2 consists of on-site drilling and sampling of the soil and groundwater. • All samples collected should be analyzed for VOCs, SVOCs, and RCRA metals • Surficial sampling of the soil. o At least 100 incremental samples • If groundwater is detected, groundwater samples should be taken. o A minimum of 5 groundwater wells o All samples should be sent a laboratory to be analyzed for VOCs, SVOCs, and RCRA metals.