o Ceramic Coating: The contractor shall develop written calibration and/or maintenance procedures and data sheets to verify calibration and/or maintenance procedures. o The contractor must submit all written reports (within five (5) working days) of calibration and/or maintenance activities performed, and including any actions needed, to the City, including but not limited to software upgrades. o The contractor shall maintain a daily log of all work history that will reside both on the contractors' database and on the customer’s computer database. o The contractor shall perform annual scheduled inspection visits at all sites included in the contract. Inspections are to include Pump System Check including: a) Check voltage supply between all phases of the electrical control panel. b) Check voltage balance between all phases on the load side of the pump control panel with pump running. c) Check for any loose or faulty electrical connections within the control panel. d) Insulation check of all motors. e) Measure resistance between stator windings. f) Check the amperage draw on all phases of the motor. g) Check the condition and operation of the motor thermal protection control system...