Demolition and replacement of existing main electrical switchboard MSB installed in 1981 and its feeder, and transformer "T-DP" also installed in 1981. Demolition and replacement of existing chiller plant, chillers, cooling towers, pumps, etc. and BAS front end. Open protocol BAS to include new DDC controls for chiller plant, computer server with cybersecure front end software, including chiller plant optimization software. Work also includes demolition of pumps in the Mechanical Penthouse. Demolition and replacement of the sanitary sewer drain piping serving the 2nd floor food services area below the floor. This work will involve removal and replacement of specific gypsum board ceilings and acoustical ceiling tiles on the first floor to access the above ceiling piping. Demolition and replacement of the existing fire alarm equipment with nonproprietary Notifier direct components.