MOBILIZATION (SEVERE DAMAGE TO GUARDRAIL) 159.000 EA BONDS AND INSURANCE 1.000 LS REMOVAL OF EXIST. GUARDRAIL 13,575.000 LF TRAFFIC CONTROL 168.000 EA PREMASH W-BEAM STRONG POST SYSTEM WSP3 7,175.000 LF MT3 LEADING END TREATMENT TL3 4.000 EA MT2 LEADING END TREATMENT TL2 4.000 EA PREMASH THRIE WITH BASE PL 6.25 SPACE 100.000 LF PREMASH NEST THRIE 1.56 SPA CRITICAL OFFSET 425.000 LF MB TRAILING END TREATMENT 4.000 EA MGS3 GR STANDARD SHOULDER 200.000 LF MGS3CS GR COMPRESSED SHOULDER 200.000 LF MGS2C GR BEHIND CURB 200.000 LF PREMASH TRAILING W-BEAM TYPE B 12.5' 17.000 EA PREMASH W-BEAM COMPRESSED SHLDR 9' POST 75.000 LF PREMASH THRIE STRONG POST GUARDRAIL 1,500.000 LF PREMASH THRIEBEAM BRIDGE CONN TBBC3 43.000 EA MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA MTBBC2 MASH THRIE-BEAM BARRIER CONNECTOR TL2 4.000 EA SACRIFICIAL FLEXIBLE WARNING MARKER POST (FWMP) 48Y/Y 21.000 EA LOW MAINT WARNING MARKER POST 36YYW(FWMP) 43.000 EA