Description Quantity Units; MOBILIZATION 1.000 LS; BONDS AND INSURANCE 1.000 LS; RAILROAD INSURANCE AND FLAGGING 001 1.000 LS; REMOVAL & DISPOSAL OF EXISTING PAVEMENT 687.500 SY; REMOVAL & DISPOSAL OF EXISTING CURB 405.000 LF; REMOVAL OF EXIST. GUARDRAIL 300.000 LF; BORROW EXCAVATION 276.000 CY; EXCAVATION FOR SHOULDER PAVING 12.700 STA; HAULING OF EXCAVATED SHOULDER MATERIAL 12.700 STA; MAINTENANCE STONE 85.850 TON; LIQUID ASPHALT BINDER PG64-22 628.522 TON; FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,210.000 SY; FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 7,375.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.5" 28,702.000 SY; MILLING EXISTING ASPHALT PAVEMENT 1.75" 23,085.000 SY; MILLING EXISTING ASPHALT PAVEMENT 2.0" 42,990.000 SY