C.2. Services Provided C.2.1. Supplier shall repair roadway signs that are damaged, missing or do not meet the required standards of the ODOT. C.2.1.1. This contract shall limit the work of repairing/replacing small signs, as defined in Section C.3 Scope of Work, to Oklahoma City Metro areas only. C.2.2. Supplier shall provide emergency response when a damaged or missing roadway sign poses imminent danger to the traveling public (e.g., overhead sign structures that have been hit by over-height vehicles or weather-related incidents). C.2.3. Suppliershall place signsin new locationsfor ODOT Sign Programs. This contract shall limit the installation of small signs, as defined in Section C.3 Scope of Work, to Oklahoma City Metro areas only. C.3. Scope of Work C.3.1. The Supplier shall supply 24-hour call notification (phone numbers) to the ODOT. C.3.2. The Supplier shall receive work orders from the State. The Supplier is not responsible for patrolling for deficient signage, however, should notify the State with any observed deficient signage. C.3.3. The Supplier shall remove all old sign debris from the job site (debris may contain electrical parts such as but not limited to LED, beacons, solar panels and wiring). All debris shall become property of the Supplier and shall be disposed of by the Supplier. The Supplier shall comply with all applicable local, State, and Federal rules and regulations. The only exception to this shall be in the case that an insurance company assumes ownership of it (e.g., an overhead sign structure). In such cases, the Supplier shall deliver the sign structure to a storage location agreed to by the Supplier and the State. C.3.4. The Supplier shall provide a quality written and/or drafted Temporary Traffic Control (TTC) Plan in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) latest approved edition, and ODOT Standards and Specifications. The Supplier shall submit the TTC Plan to ODOT’s local field division and shall not begin any work prior to the written approval by ODOT’s local field division. All costs of TTC plan, installation and subsequent removal of all necessary construction traffic control shall be included in the price bid for “other items of work.”