The winning Contractor[s] of this bid would be required to complete the following tasks and maintain the following responsibilities: Provide Construction Services to GP&L— within the entire footprint to include but not limited to the following Texas counties: Dallas, Collin, Denton, Tarrant, Kaufman, Hunt Robertson, Brazos, Grimes, Madison Pecos, Upton, Crane, Crockett, Ector Rusk, Panola To include Substation, Transmission Line, and Civil and Sitework. Non-emergency work must be able to be mobilized to any site in GP&L’s footprint within a 48 hour window from GP&L Notification. Emergency work must be able to be mobilized of labor and equipment for system failure shall be within four (4) hours of notification. While following all Technical Specifications and General Requirements. While following quoted Bid Units Time and Equipment Rates Other Units provided in the Bid The winning Contractor is expected to provide full time use of the following Load Base Crews: Transmission Line Load Base Crew This crew shall be certified to conduct energized work This Load Base Crew shall be listed in the Bid Units as an hourly rate that includes all of the following personnel and equipment. GP&L shall have the ability to use this dedicated crew year long if requested of the Contractor. This crew shall include the following: Personnel: Foreman 4x Linemen 2x Operators 2x Ground Hands Safety Coordinator (for emergency responses) *Any additional personnel needed per task/job basis shall use the rate sheet Equipment 2x 125-foot bucket trucks 2x Crew trucks 1x 50-ton crane 1 haul truck 1 float trailer 1 utility trailer 1 tool trailer *Any additional equipment needed per task/job basis shall use the rate sheet