A. General: Apply components of resinous flooring system according to manufacturer's written instructions to produce a uniform, monolithic wearing surface of thickness indicated. 1. Coordinate application of components to provide optimum adhesion of resinous flooring system to substrate, and optimum intercut adhesion. 2. Cure resinous flooring components according to manufacturer's written instructions. Prevent contamination during application and curing processes. 3. At substrate expansion and isolation joints, comply with resinous flooring manufacturer's written instructions. B. If required by flooring system manufacturer, apply primer over prepared substrate at manufacturer's recommended spreading rate. C. If required by flooring system manufacturer, apply waterproofing membrane, where indicated, in manufacturer's recommended thickness. Apply waterproofing membrane to integral cove base substrates. D. Apply reinforcing membrane to substrate cracks. E. Integral Cove Base: Before installation of Epoxy Cove Base, the existing Quarry Cove Base can remain if vendor can guarantee that the epoxy will adhere to existing base. If vendor cannot guarantee, then the existing cove base needs to be removed. Where indicated, apply cove base mix to wall surfaces before applying flooring. Apply according to manufacturer's written instructions and details including those for taping, mixing, priming, troweling, sanding, and top coating of cove base. Round internal and external corners...